Master Bathroom Remodel: Drywall Installed

IMG_0466

I’m a few weeks late on posting this. I really haven’t had the time to sit down and right a proper entry until now. The day that I never thought would come finally came, the dry wall is up in the master bath. There were times when I was demolishing the bathroom that I thought it would it would be a impossible task to finish it. It was such a mess and was going to cost so much money to put back together. This is a big milestone for me.

This was my first time installing drywall and I made a few mistakes. Apparently the top peice of drywall should go up first. I put the bottom peice up first which left me with a gap at the top. I also managed to to incorrectly measure every single protrusion through the wall and had to make all the holes in the drywall larger to adjust.

Next items to start working on are the flooring and the shower waterproofing. The Warmly Yours floor heating was very expenisve and cost me my budget for the next few months. The schluter kerdi product I plan to use for the shower stall will be pretty expensive so that purchase will have to wait. I will work with what I have but won’t be able to buy much therefore I don’t expect a lot of progress over the next month.

|

Master Bathroom Remodel: Plumbing Finished

It’s been almost two months since my last post on the master bathroom remodel progress. I had to wait for a special order shower head to arrive which took over a month. I also had to pay for the previous months remodel.

Shower connections
The special order bathroom fixtures I bought were very expensive. I can’t believe I spent so much on them. Non stock fixtures are simply not cheap and i really didn’t like the stock fixtures. I think i will be really happy with them once they are installed but I didn’t expect to pay that much for them.

Today a plumber friend came over and help me install the new shower and vanity plumbing. OK, really he did all the work. I have never done any copper soldering before so I wasn’t able to do this myself. Now that I see how it’s done it’s really not that hard and i think i could do it myself next time.

IMG_0453
The first thing which needed to be done was to replace the dual control shower controls with a single control and route the shower head from the west wall to the south wall. There wont be a regular shower head installed here, it will be a handheld shower with a slide bar. Therefore I thought it would be best to install it on a separate wall from the shower controls.

I decided to move the vanity from the north wall to the east wall. I think i can better utilize this small space and install an extra cabinet next to the sink by having the cabinet on the east wall. The connections points however were too far over to be hidden under the sink. The cold water outlet and the drain pipe both needed to be moved over several inches.

I can now start putting the walls back up. Before I do I will put some insulation in to act as sound dampening materials. I also ordered the electric radiant floor heating for both the master bath and bedroom. Warmly Yours is having a 15% off sale for order of $1500 or more which i took advantage of. It may take me a few more months to pay that off and start work on the bathroom again.

|

Master Bathroom Remodel: Electrical Nearly Complete

Recessed fixturesbroan exhaust fan
The two recessed lighting fixtures are installed. The fixture over the toilet is a Broan 744 Recessed fixture with exhaust Fan. It's supposed to have a noise rating of 1.5 sones, which isn't the quietest but not the loudest. It's the quietest recessed fixture I could find. I'm done with all the attic work in this location so I put the ceiling back up hopefully I won't change my mind about something and have to take it out again.

I still want to put in two electrical outlets, one for a heated towel rack and one to put in a cabinet (so I can put all my rechargeable stuff and hide it). I have to decide where I want to tie into the existing GFCI protected circuit.

I special ordered some bathroom fixtures from Lowes on Wednesday. I can't believe how much I spent on them, but I just didn't like the cheap in-stock stuff. Bathroom fixtures just simply are not cheap. They were supposed to call me on Thursday and let me know how long before they arrive and it's Saturday and I haven't heard anything back.

I've put together the base cabinets I bought from IKEA to figure out how to lay them out. I've drawn out several ideas but it's hard to tell without actually seeing it.

|

Master Bathroom Remodel: Pocket Door Frame Complete

Pocket door frame install
It's taken me a long time to complete what now seems pretty simple. I can finally call the pocket door kit install done. Instead of going with a prebuilt frame that can be had at Home Depot, I went with a Johnson Hardware Universal Pocket Door Frame Kit. One reason I didn't go with the prebuilt frame is because it looks like it's not something I could take into the house and install by myself. The Johnson kit comes in a box and in pieces which were easy to install by myself.

I'm not sure how much the Home Depot prebuilt kit is, but the Johnson Hardware kit was $60 through Ace Hardware's online site.

Next up, the electrical

|

OMG! I Actually Worked On The Master Bathroom

Last fall, I threatened that I would have the master bathroom completed by the end of the winter. Here it is spring and I did almost nothing to the bathroom. I have a variety of excuses that I wont go into now, however I did finally make some actual progress on it this weekend.

Before I can do anything I need to install the pocket door. Before I install the pocket door I need to relocate the wiring that exists on the wall where the door goes.

Original wiring location
The wiring consists of power in, a wire to the lights controlled by a switch and a power out to a outlet. The good news is the wiring was easy to move to the next wall, it was loose in the attic and there was plenty of room to move it. I thought I would leave the outlet unpowered for now, until I figured out how I was going to rewire everything, apparently the wire to the outlet is also hooked up to the living room.

Temporary wiring location
Now I have a problem that I need to wire that outlet back up, so i have Romex running along the other side of the bathroom along up to the switch. It looks pretty messy and dangerous in the pictures, I know. Trust me it's safe and temporary.

I need to decide how to wire up a exhaust fan, will it go near the light switch or near the toilet? I also need to figure out if I'm going to use a fancy digital shower control. If so It will use the power from the outlet then I can wire it up properly.

Finally I can install the pocket door. I have the studs marked to cut down, but I'm waiting for some friends to come by and verify my measurements before I screw it all up. I will save the pocket door install for another post.

|

Digital Shower Controls?

Grohe digital thermostat
Now the the master bathroom is down to the studs, it's my chance to put in exactly the kind of shower controls that I want. The Grohe digital thermostat looks like the kind of controls I'm looking for. Their website states:

The main control unit allows you to select the temperature, flow rate and to program the three personalised user buttons. These buttons illuminate when selected directly or via the remote control. Two backlit LCD panels display the water temperature and flow level and are controlled by the temperature and flow dials. The flow control dial can also be used to start the shower. To prevent children from turning the water above 38ºC, the SafeStop (temperature override) button must be pressed before the raising the temperature above this level - so there's no risk of accidental scalding.
For convenience, the Pause button allows you to temporarily stop the water mid-shower - great if you want to wash your hair. When you're ready to re-start you shower, press the button again and it will return to the exact same setting. Finally, the Stop button is used to turn the shower off. This button can also be used to turn the shower on at the safe temperature of 38ºC - perfect for when you have guests staying.

Pretty nifty. I can't seem to find US pricing or availablity for this product. Anyone familiar with this product or similar devices?

|

Fun And Excitement With Shower Pan Liners

I wrote perviously about how the shower in the master bathroom had leaked. Now that I have researched the issue more, I understand more about how shower floors are constructed. The original floor was constructed as a "mortar bed" and it was not constructed correctly. It was missing the bottom membrane. The mortar was placed directly on the cement floor. The membrane that was installed was brittle and too far under the top layer of mortar. Finally, there was no strengthening agent, such as chicken wire.

I didn't want to repeat what I considered a poorly engineered design so I looked into solid surface designs. Royal Stone produces a 48x48 solid surface pre-made floor that resembles stone (think Corian). The normal price is about $900, but my drain is not in the location of the pre-made floor so I would have to order a custom made floor. Since they would have to made a new mold for my application the price would be about $1600 at the cheapest. That's way too much to spend on just the shower floor.

I then found Tile Redi products which are a thick plastic solid floor that you can tile on directly. Cheaper at $679 (not by much), but not in the size I want and the drain hole isn't in the same location.

Now I'm back to the mortar floor shower floor as the replacement. Considering the price and how a proper floor is suppose to be built, there should not be a problem for the new floor.

|

Taking The Master Bath Back To The Studs

About a year ago most house remodeling projects came to a halt. Costs got a little out of control and I ended up with some large credit card bills. I've eliminated those bills and am ready to start back on my projects. I didn't waste any of that money, it was just a bit too much to spend at once. I now have this radical new idea that I will call "planning and budgeting" and I will apply it to projects going forward.

A quick recap on this project, the house was a foreclosure. Though not trashed, it was pretty dated and in need of remodeling in several places. The master bath showed signs of leakage in the shower. It's pretty clear that it's been going on for a while, it had leaked into the adjacent bathroom and into the master bedroom.

Tree roots under the shower tile
I was sure the bathroom wasn't usable in it's current condition and would need to be tore down to the studs. As I started to demolish the walls of the shower I found that it was pretty much being held together with tree roots. Roots had grown a good foot up the wall of the shower in between the tile. As the roots took hold of the tile, it probably just made the leaking worse.

Cement gaps around shower drain
This bathroom has not been used in at least 4 years. Yet as I broke up the mortar and shower pan I found the mortar was still pretty wet. There were so many roots that it smelled like a nursery. Finally, I think i have found the root cause. The drain pipe is basically floating, there's a huge gap of missing concrete around it and I can clearly see where main roots have made their way through the floor (this isn't the first time I've had issues with the cement in this house). I assume that a little water made it's way around the drain, signaling for the roots to come through. As the roots grew threw the tile the wall leakage just got worse causing more roots to grow. At least I know I wasn't wrong that there was no saving it.

The demolition is about 99% complete. I intended to get a good amount of this bathroom completed this winter. I've got a basic plan put together, but that's a post for another day.

|

Master Bedroom And Bathroom Remodel Progress

I know what I said, that the sprinkler system is going to be my priority. Give me a break thought, the back yard is sitll pretty muddy and now full of weeds. I'm now sure that the sprinkler project will have to wait till next year.

IMG_7627.JPGIt's on to indoor projects, the first of which is the master bedroom and bathroom. I had a demolition party scheduled for the end of August, where I invited some of my friends over to demolish the house. Surprisingly, most of them didn't show up. Enough did to get most of the work done.

For the bedroom the goal was to take the closet from the neighboring bedroom to create a bigger overall closet. This was accomplished.For the bathroom the goal was to remove the framed in shower. Both of these were accomplished. After the demo was completed, with drywall and crap all over the place, is when I questioned what I have done. After two trips to the dump and probably 6 hours of clean up I'm not sure I did make the right decision.

The framed in shower was not usable. It had been leaking pretty badly for quite a while. The lower framing was rotted, the water had leaked into the bedroom and there was even plant roots growing about a foot up the interiors of the wall. One doesn't expect mold in a dry state such as New Mexico, but there was plenty of mold in the walls.

Picture 15The next step is to plan for the rebuild. Since it's a small room, 7 foot by 8 foot, I'd like to put in a corner whirlpool tub with a shower. I think I can get a 54 inch by 54 inch corner tub to fit. I also plan to put in a electric radiant floor heating. The plan here shown is from Warmly Yours.

Can anyone loan me a few thousand dollars?


|